NIKIMAT
 N    I    K    I    M    A    T

Amel Super Maramu 2000

Lofrans Tigres Windlass Overhaul

Part 15:

15 Pictures from 115 to 129

Reassembly of the Shaft Circlip, Wormwheel, keys, Dog Clutch, Spring and Washers

 

Picture 115
As I mentioned, I keep the parts (including the parts that will be replaced) in the order they were located

Here is the reassembly sequence
1) put a new Circlip 25 Din 471 (Part 324) in the middle of the shaft next to the key spot in the middle
2) slide the Wormwheel (Part 476) from the left of the shaft until it rest on the Circlip we just put
3) add a new Circlip 25 Din 471 (Part 324) at the (left) end of the shaft to hold the Wormwheel (Part 476) in place
4) add the 2 key 6x6x40 (Part 479) in the middle of the shaft
5) slide the Dog clutch (Part 477) and its Spring (Part 326) from the right of the shaft
The Dog Clutch will slide over the 2 keys against the Wormwheel
6) add the Washer (Part 325)
7) add a new Circlip 25 Din 471 (Part 324) from the right of the shaft against the washer

 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 116
New Circlip 25 Din 471 (Part 324)
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 117
Put a new Circlip 25 Din 471 (Part 324) in the middle of the shaft next to the key spot in the middle
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 118
Here it is
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 119
slide the Wormwheel (Part 476) from the left of the shaft until it rest on the Circlip we just put
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 120
add another new Circlip 25 Din 471 (Part 324) at the (left) end of the shaft to hold the Wormwheel (Part 476) in place
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 121
add one of the 2 key 6x6x40 (Part 479) in the middle of the shaft
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 122
Add the other one
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 123
Here is a part I am not sure:
I am not sure I am supposed or not to put grease
this part might be lubricated by the oil inside the windlass
I hope someone can tell if we need or not oil

 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 124
I also grease the Dog clutch (Part 477)
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 125
slide the Dog clutch (Part 477) and its Spring (Part 326)
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 126
Slide Dog Clutch will slide over the 2 keys against the Wormwheel
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 127
add the Washer (Part 325)
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 128
add a new Circlip 25 Din 471 (Part 324) from the right of the shaft against the washer
Alone, this was quite difficult as I had to hold the washer and spring compressed and also hold the tool and bring the circlip
I end up using a PVC pipe that just fit around the shaft to push the circlip in its final position
And for various mistakes I end up doing it 3 times... replacing circlip.
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Picture 129
Completed
 windlass lofrans tigres overhaul Amel Super Maramu 2000

 

Next: Part 16
Reassembly of the Worm (Shaft) with O Ring, Seal,

 

Part 1               10 Pictures from 01 to 7
Preparation, removing the cover of the electric motor, disconnecting the wires

Part 2             17 Pictures from 8 to 24
Unbolting the windlass from the deck (and complications), protecting electric wires, removing the oil

Part 3             8 Pictures from 25 to 32
Extraction of the shove gipsy, gipsy / chain wheel and gipsy holder

Part 4             15 Pictures from 26 to 40
Extraction of the drum, emergency wheel clutch plate and manual emergency wheel

Part 5             8 Pictures from 41 to 48
Opening the windlass, extract broken bolt on cover

Part 6             7 Pictures from 49 to 55
Removing oil seals, bearings, O Ring, on cover

Part 7             13 Pictures from 56 to 68
Removing shaft and its Circlip, washer, spring, Dog Clutch and key

Part 8             5 Pictures from 69 to 73
Removing seal and bearing from the housing, unbolting the electric motor from the housing

Part 9             10 Pictures from 74 to 83
Removing the Worm (shaft) from the electric motor, removing Thrust Ring, Thrust Bearing Spacer, seal, O Ring and key

Part 10             4 Pictures from 84 to 87
Removing oil, lay parts, failed attempt to remove the bolt to inspect the brushes

Part 11             7 Pictures from 88 to 94
Cleaning bolts, shaft, painting the motor to prevent rust

Part 12             6 Pictures from 95 to 100
Removing the Chain Counter "Eye" or sensor

Part 13             8 Pictures from 100 to 107
Removing the Switches on the windlass and cleaning

Part 14             6 Pictures from 108 to 114
Cleaning of the housing, Cover, Deck, attach Anchor Chain to fishing line

Part 15             15 Pictures from 115 to 129
Reassembly of the Shaft Circlip, Wormwheel, keys, Dog Clutch, Spring and Washers

Part 16             16 Pictures from 130 to 145
Reassembly of the Worm (Shaft) with O Ring, Seal,

Part 17             3 Pictures from 146 to 148
Putting key back on Electric motor shaft

Part 18             8 Pictures from 149 to 156
Putting back O Ring and bearing on Motor Cover

Part 19             12 Pictures from 157 to 168
Putting back the Worm (Shaft), bearing and (main) Shaft in the Body

Part 20             9 Pictures from 169 to 177
Bolting back electric motor and putting Cover to Body

Part 21             16 Pictures from 178 to 193
Adding seals back on Cover and Body

Part 22             15 Pictures from 194 to 208
Preparing for Chain Counter "Eye"/sensor, Add Switches on Cover

Part 23             19 Pictures from 209 to 217
Installing new Chain Counter "Eye"/sensor on Cover

Part 24             20 Pictures from 218 to 239
Preparing and bolting the Windlass on Deck

Part 25             5 Pictures from 240 to 244
Reconnecting Electric Cable to Windlass

Part 26             3 Pictures from 245 to 247
Add Gasket on Motor Cover

Part 27             6 Pictures from 248 to 253
Reconnecting Electrical wires to Switches

Part 28             4 Pictures from 254 to 258
Reconnecting electric wires of the Chain Counter "Eye" / Sensor

Part 29             7 Pictures from 259 to 266
Adding Silicone, slide back Motor Cover, add Oil

Part 30             12 Pictures from 267 to 278
Reassembly of the drum, emergency wheel clutch plate and manual emergency wheel

Part 31             16 Pictures from 279 to 294
Reassembly of the shove gipsy, gipsy / chain wheel and gipsy holder

Part 32             6 Pictures from 295 to 300
Testing, putting chain back on